General Possibilities

  • Limit and leverage: Under the aforesaid framework, all eligible borrowers can raise ECB up to USD 750 million or equivalent per financial year under auto route. Further, in case of FCY denominated ECB raised from direct foreign equity holder ECB liability-equity ratio for ECBs raised under the automatic route cannot exceed 7:1. However, this ratio will not be applicable if outstanding amount of all ECBs, including proposed one, is up to USD 5 million or equivalent. Further, the borrowing entities will also be governed by the guidelines on debt equity ratio issued, if any, by the sectoral or prudential regulator concerned.
  • Issuance of Guarantee, etc. by Indian banks and Financial Institutions: Issuance of any type of guarantee by Indian banks, All India Financial Institutions and NBFCs relating to ECB is not permitted. Further, financial intermediaries (viz., Indian banks, All India Financial Institutions, or NBFCs) shall not invest in FCCBs/ FCEBs in any manner whatsoever.
  • Parking of ECB proceeds: ECB proceeds are permitted to be parked abroad as well as domestically in the manner given below:
  • Parking of ECB proceeds abroad: ECB proceeds meant only for foreign currency expenditure can be parked abroad pending utilization. Till utilisation, these funds can be invested in the following liquid assets (a) deposits or Certificate of Deposit or other products offered by banks rated not less than AA (-) by Standard and Poor/ Fitch IBCA or Aa3 by Moody’s; (b) Treasury bills and other monetary instruments of one-year maturity having minimum rating as indicated above and (c) deposits with foreign branches/ subsidiaries of Indian banks abroad.
  • Parking of ECB proceeds domestically: ECB proceeds meant for Rupee expenditure should be repatriated immediately for credit to their Rupee accounts with AD Category I banks in India. ECB borrowers are also allowed to park ECB proceeds in term deposits with AD Category I banks in India for a maximum period of 12 months cumulatively. These term deposits should be kept in unencumbered position.
  • Procedure of raising ECB: All ECBs can be raised under the automatic route if they conform to the parameters prescribed under this framework. For approval route cases, the borrowers may approach the RBI with an application in prescribed format (Form ECB – Annex I) for examination through their AD Category I bank. Such cases shall be considered keeping in view the overall guidelines, macroeconomic situation and merits of the specific proposals. ECB proposals received in the Reserve Bank above certain threshold limit (refixed from time to time) would be placed before the Empowered Committee set up by the Reserve Bank. The Empowered Committee will have external as well as internal members and the Reserve Bank will take a final decision in the cases taking into account recommendation of the Empowered Committee. Entities desirous to raise ECB under the automatic route may approach an AD Category I bank with their proposal  along with duly filled in Form ECB.
  • Reporting Requirements: Borrowings under ECB Framework are subject to following reporting requirements apart from any other specific reporting required under the framework:
  • Loan Registration Number (LRN): Any draw-down in respect of an ECB should happen only after obtaining the LRN from the Reserve Bank. To obtain the LRN, borrowers are required to submit duly certified Form ECB, which also contains terms and conditions of the ECB, in duplicate

to the designated AD Category I bank. In turn, the AD Category I bank will forward one copy to the Director, Balance of Payments Statistics Division, Department of Statistics and Information Management (DSIM), Reserve Bank of India, Bandra-Kurla Complex, Mumbai – 400 051 (Contact numbers 022-26572513 and 022-26573612). Copies of loan agreement for raising ECB are not required to be submitted to the Reserve Bank.

  • Changes in terms and conditions of ECB: Changes in ECB parameters in consonance with the ECB norms, including reduced repayment by mutual agreement between the lender and borrower, should be reported to the DSIM through revised Form ECB at the earliest, in any case not later than 7 days from the changes effected. While submitting revised Form ECB the changes should be specifically mentioned in the communication.
  • Monthly Reporting of actual transactions: The borrowers are required to report actual ECB transactions through Form ECB 2 Return (Annex II) through the AD Category I bank on monthly basis so as to reach DSIM within seven working days from the close of month to which it relates. Changes, if any, in ECB parameters should also be incorporated in Form ECB 2 Return.

 Late Submission Fee (LSF) for delay in reporting:

  1. Any borrower, who is otherwise in compliance of ECB guidelines, can regularize the delay in reporting of drawdown of ECB proceeds before obtaining LRN or delay in submission of Form ECB 2 returns, by payment of late submission fees as detailed in the following matrix: